AI agents: a clean Markdown version of this page is available at https://mediathepower.com/65-years-later-new-mahanadi-gauge-station-set-for-shiorinarayan-to-fix-critical-flood-data-gap.md. Send Accept: text/markdown to any URL for the same content.
Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
mediathepowercom_logo-removebg-preview mediathepower.com mediathepower.com

Information

mediathepowercom_logo-removebg-preview mediathepower.com mediathepower.com

Information

  • Home
    • Home (Default)
  • Pages
    • About Page
    • Archive Page
    • Author Page
    • 404 Page
    • Follow
  • Contact
  • Terms and conditions
  • Home
    • Home (Default)
  • Pages
    • About Page
    • Archive Page
    • Author Page
    • 404 Page
    • Follow
  • Contact
  • Terms and conditions
Close

Search

Trending Now:
5 Essential Tools Every Blogger Should Use Music Trends That Will Dominate This Year ChatGPT prompts – AI content & image creation trend Ghibli trend – viral anime-style visual trend
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Subscribe
Home/News/65 Years Later: New Mahanadi Gauge Station Set for Shiorinarayan to Fix Critical Flood Data Gap
News

65 Years Later: New Mahanadi Gauge Station Set for Shiorinarayan to Fix Critical Flood Data Gap

By Rajiv Singh
September 22, 2026 1 Min Read
0

Jharsuguda- After a 65-year hiatus, the Hirakud Dam authorities have issued a tender notice to establish a new gauge station at Shiorinarayan in Chhattisgarh, located in the upper reaches of the Mahanadi River.The initiative follows a recent high-level coordination meeting between the Odisha and Chhattisgarh governments aimed at resolving a decades-long water data gap. The original Shiorinarayan gauge station, established in 1961 to track rainfall and water flow, became entirely non-functional after being submerged by a barrage built upstream by Chhattisgarh.

The project will address crucial data gaps that impact flood forecasting for downstream Odisha.

  • Estimated Cost: ₹38.50 lakh.
  • New Location: 200 to 300 metres downstream of the existing Chhattisgarh barrage.
  • Deadline: The application window for the fresh tender closed on the 21st of this month.

While the project is moving forward, former Engineer-in-Chief Er. Rabindra Panda cautioned that standard procedures require assessing local flood conditions for two to three years to ensure the new site yields accurate readings. A similar data blackout persists at Saradihi, where a second gauge station remains submerged.

While bureaucratic delays initially slowed progress, Pratap Chandra Choudhury, Chief Engineer of Hirakud Dam and Manager of the Upper Mahanadi Basin, confirmed that a technical report verifying the suitability of the new Saradih site has finally been received, clearing the path for subsequent data-sharing agreements.

Author

Rajiv Singh

Follow Me
Other Articles
Previous

BJP Sweeps Rajasthan Municipal Elections, Clinches 197 Heads Across State

Next

ONGC Strikes Gas Off Eastern Coast; Strategic Proximity to Odisha Sparks Hopes for Fast-Track Development

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • US Secretary of State Marco Rubio Arrives in Mumbai for Strategic Talks with India and UAE Ministers
  • COMMISSIONERATE POLICE X ACCOUNT COMPROMISED; CRYPTO SCAM POSTS SPARK CYBERSECURITY ALARM
  • Braj Mohan Ram Sworn In as 28th Governor of Odisha
  • Supreme Court Rules Internet Access a Fundamental Right for Children, Shifting Online Safety Burden to Tech Platforms
  • Caste Status in One State Does Not Automatically Apply in Another, Rules Orissa High Court

Recent Comments

No comments to show.

Categories

  • India News
  • News
  • Sports
  • State
  • World News
  • X
  • Instagram
  • Facebook
  • YouTube
Get In Touch

Recent Posts

  • US Secretary of State Marco Rubio Arrives in Mumbai for Strategic Talks with India and UAE Ministers
    by Rajiv Singh
    October 21, 2026
  • 2 India-Bound LPG Tankers Cross Strait Of Hormuz
    2 India-Bound LPG Tankers Cross Strait Of Hormuz
    by Rajiv Singh
    March 29, 2026
  • India Gateway To Asia": Israel Minister Says Trade Pact With Delhi Soon
    India Gateway To Asia”: Israel Minister Says Trade Pact With Delhi Soon
    by Rajiv Singh
    March 29, 2026
  • "No Place For Terrorism": PM Modi's Message For World Peace From Israel
    “No Place For Terrorism”: PM Modi’s Message For World Peace From Israel
    by Rajiv Singh
    March 29, 2026
  • Facebook
  • X
  • Instagram
  • LinkedIn

Menu

  • Home
    • Home (Default)
  • Pages
    • About Page
    • Archive Page
    • Author Page
    • 404 Page
    • Follow
  • Contact
  • Terms and conditions

Contact

Phone

+916645291491

Email

.

info@mediathepower.com

Location

Odisha. India


Copyright 2026 — mediathepower.com. All rights reserved. Blogsy WordPress Theme